Bank Organization Program Change

Dear Elektron Users,

ive read a lot of threads and tried a lot of things by myself but got stuck by the following situation: I am not able to send program change from 1 to X and changing my "kit" like in the order I saved it in the kit-folder. I have for example 11 Kits á 4 Track-Sounds and I want them to stay in the order I saved and named them but when I send programs change bank1 prg1 I land at kit68 in my kit folder. I know that its my mistake how I saved it on the device but I am not able to change that.
I can’t find out how to assign A01 to Kit1, A02 to Kit2 and so on.

Do I really need to save Kits to Programs?

I hope someone gets my intention and I am not lost with this.
Thank you guys a lot. If there is a thread, which describes my problem, please give me a hint.

Best, Willi

A post was merged into an existing topic: Confused about Kits/Projects/Sounds etc