Hi,
using my evolver with MD and i want sent prg. change from the MD. But i know that “Program Change” is not a continuous controller. “Bank select” is CC#0 and CC#32 but that changes banks, not programs/patches.
Is it possible to send prg. changes via MD?
Bank changes works fine i need the possibility to change prgs.
1100 nnnn and second 0ppppppp
Program change, 0 – 127 for Programs 1 – 128
that is what the Evolver manual shows for prg change.
Can´t find anything in the manual of the MD to send this message.